Start your 7-day free trial — unlock full access instantly.

Back to Search

Lead Closed

This opportunity is no longer accepting submissions.

Wellfield Water Treatment Plant Upgrades Town Of Boonton, County Of Morris, State Of New Jersey

BID #: 57
ISSUED: 3/21/2025
DUE: 4/22/2025
VALUE: TBD
85
Rating

Risk Rank

Yellow Risk

AI-Powered Lead Insights

Executive Summary

The Town of Boonton is seeking bids for Wellfield Water Treatment Plant Upgrades. The project involves upgrading the existing water treatment plant through the installation of iron and manganese pressure vessels, improving the backwash and discharge system, and upgrading SCADA controls. The contractor will be responsible for all labor, supervision, materials, and equipment needed for the project. A non-mandatory pre-bid meeting will be held on March 26, 2025. Bids are due by April 22, 2025, at 10:00 AM.

Detailed Risk Breakdown

local preference

No Flags Found

performance bond

Evidence Detected

2 CLAUSES FOUND
"...One hard copy of the Bids shall be made on the forms provided and made part of the Contract Documents, a certified check or cashier's check made payable to the order of the Town of Boonton, or a duly executed Bid Bond, in the amount of ten percent (10%) of each bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that They can obtain the required Performance Bond...."

liquidated damages

No Flags Found

Quick Actions

Contacts

ELIZABETH BONSIEWICH, RMC

Town Clerk

Explore More

Timeline

First Discovered

Mar 31, 2026

Last Info Update

Apr 30, 2026

Start your 7-day free trial

Get instant notifications and full bid analysis. Existing users will be logged in automatically.

Start Free Trial