Start your 7-day free trial — unlock full access instantly.
← Back to Search2 CLAUSES FOUND
Lead Closed
This opportunity is no longer accepting submissions.
Wellfield Water Treatment Plant Upgrades Town Of Boonton, County Of Morris, State Of New Jersey
BID #: 57
ISSUED: 3/21/2025
DUE: 4/22/2025
VALUE: TBD
85
Rating
Risk Rank
Yellow Risk
AI-Powered Lead Insights
Executive Summary
The Town of Boonton is seeking bids for Wellfield Water Treatment Plant Upgrades. The project involves upgrading the existing water treatment plant through the installation of iron and manganese pressure vessels, improving the backwash and discharge system, and upgrading SCADA controls. The contractor will be responsible for all labor, supervision, materials, and equipment needed for the project. A non-mandatory pre-bid meeting will be held on March 26, 2025. Bids are due by April 22, 2025, at 10:00 AM.
Detailed Risk Breakdown
local preference
No Flags Found
performance bond
Evidence Detected
"...One hard copy of the Bids shall be made on the forms provided and made part of the Contract Documents, a certified check or cashier's check made payable to the order of the Town of Boonton, or a duly executed Bid Bond, in the amount of ten percent (10%) of each bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that They can obtain the required Performance Bond...."
liquidated damages
No Flags Found
Quick Actions
Contacts
ELIZABETH BONSIEWICH, RMC
Town Clerk
Explore More
Timeline
First Discovered
Mar 31, 2026
Last Info Update
Apr 30, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis.
Start Free Trial