Start your 7-day free trial — unlock full access instantly.
← Back to Search
Lead Closed
This opportunity is no longer accepting submissions.
2025 Road Program
BID #: CDT0116
ISSUED: 7/7/2025
OPENED: 12/8/2025
DUE: TBD
VALUE: TBD
100
Rating
Risk Rank
Green Risk
AI-Powered Lead Insights
Executive Summary
This document outlines the construction plans for the Township of Cranford's 2025 Road Program. The project encompasses significant road improvements along Stoughton Avenue (from Lexington Avenue to Shadowlawn Way) and North Union Avenue (from Walnut Avenue to North Avenue). Key works include HMA milling, hot mix asphalt paving, installation and repair of concrete and Belgian block curbing, concrete sidewalks, driveway repairs, and accessible curb ramps designed to ADA standards.
The project also details extensive general notes covering materials (requiring American-made), workmanship, adherence to NJDOT Standard Specifications (2019, amended), traffic control measures, soil erosion and sediment control (including inlet filters and tree protection), and utility coordination. Contractors are responsible for obtaining permits, site examination, shop drawing approvals, and maintaining access for residents, businesses, and emergency services throughout the project.
The engineering plans were issued by Colliers Engineering & Design on July 7, 2025, with an estimated total project duration of 9 weeks for the construction sequence. The detailed plans emphasize adherence to various safety codes, utility mark-outs, and coordination with local authorities.
Detailed Risk Breakdown
local preference
No Flags Found
performance bond
No Flags Found
liquidated damages
No Flags Found
Quick Actions
Contacts
Erik Hastrup
Department of Public Works
(***) ***-****
UnlockExplore More
Timeline
First Discovered
Apr 27, 2026
Last Info Update
Apr 30, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis.
Start Free Trial