Start your 7-day free trial — unlock full access instantly.
← Back to Search
Road Paving Plan
BID #: N/A
ISSUED: 5/1/2015
DUE: TBD
VALUE: TBD
100
Rating
Risk Rank
Green Risk
AI-Powered Lead Insights
AI Summary is being generated. Check back shortly.
Web Content
Road Paving Plan Page Navigation Close Administration Road Paving Plan The 10 Year Road Paving Plan is a subjective document. Obviously this plan will vary due to any grants and final decisions of any Governing Body. The annual budget is also subjective and will be based on current pricing in any given year. This annual budget is be determined and finalized annually by vote of a Governing Body in conjunction with its ability to budget road work within a current operating budget or its desire to Bond for such work. This 10 year plan can be adjusted by moving specific projects to the future but it is my recommendation that the plan does not exceed a 15 year maximum to complete. Respectfully Submitted By: Former Mayor Jon Dunleavy Borough of Bloomingdale Road Paving Plan (Revised May, 2015) Bloomingdale Road Mileage
Document Text
--- Document: Road Paving Plan (Revised May, 2015) ---
2013 Road Paving
At the time that this final version of the 10 Year Road Plan was
concluded the 2013 paving projects were completed.
Total mileage
1. Morse Lake Rd
.30
2. Raffman Rd
.01
3. Knolls Rd.
.75
4. Jeffries Drive
.20
5. Delazier Place
.10
6. Woodward Ave-intersection only
7. Vreeland Ave
.80
8. Lakeside Ave
.20
9. Old Ridge Rd
.10
10. Reeve Ave (50%)
.40
11. Hillside Ave (50%)
.35
12. Third St
.10
13. Star Lake and Red Twig Intersection
14. Oak St and Reeve Ave Intersection
15. Borough Hall Side Exit
16. All Main St. cross walks
Total mileage 3.31
2014 Road Paving
Total mileage
1. Rafkind Rd-(DOT GRANT) Including Glen Rd. 1.20
2. Clark St
.50
3. Mary St
. 10
4. Sunrise Ave .11
5. Reeve Ave (remainder)- not done moved to 2015 DOT
grant
6. Forest Ave - moved to 2015
Total mileage 1.91
2015 Road Paving
Total mileage
1. Chestnut
.20
2. Hillside (50%)
.35
3. Hemlock
.10
4. Star Lake Rd (DOT GRANT)
.60
5. Catherine St
.40
6. Shelter lot
7. Forest
.11
8. Crane
.20
9. Captolene
.20
10.
Boro hall lot front only
11.
Bogue and Sandra intersection
Road pave via DEP loan
1. Poplar
.15
2. Birch
.10
3. Chestnut
.20
4. Oak
.20
5. First st.
.10
Road to be pave CDBG and DOT
1. Reeve-half
.40
2. Ryerson
.15
Total mileage 3.36
2016 Road Paving
Total mileage
1. Pleasant View
.20
2. High St
.10
3. Pearl St
.15
4. Grove St
.10
5. Red Twig Trail
.53
6. oak st.--tbd
7. valley view
.11
8. webber
.10
Total mileage 1.29
2017 Road Paving
Total mileage
1.Mathews Drive
.10
2. Mathews Terr
.10
3. Maple Ave
.22
4. Hamilton St
.20
5. Walter Dr
.15
6. Walnut St
.15
7. Leary Ave
.15
8. Cedar St
.15
9. Sophia
.10
10. Wallace
.20
Apply for Van Dam—DOT grant
.70
Total mileage 2.22
2018 Road Paving
Total mileage
1. Bailey Ave
.20
2. Ballston St
.20
3. White Haven
.10
4. Hilltop
.40
5. Hestor St
.15
6. Anna Rose Ct
.20
7. HillCrest
.20
8. Woodlot
.20
9. Winifred
.10
10.
William
.10
Total mileage 1.85
2019 Road Paving
Total mileage
1.Orchard St
.20
2.Park Ave
.10
3.Roy Ave
.20
4.Second St
.10
5.Tice St
.15
6. Andrew place
.25
Total mileage 1.00
2020 Road Paving
Total mileage
1.Sandra Lane
.25
2.Sally St
.20
3.Natalie Court
.20
4.Oakwood Terrace
.10
5. Cook Ct
.10
6. Elm St
.10
7. Heather Lane
.15
8. Ann St
.16
Total mileage 1.26
2021 Road Paving
Total mileage
1. George St
.01
2. Henion St
.10
3. Linden St
.10
4. Memorial Ct
.10
5. John St
.01
6. Highland Ave
.46
7. Ella St
.25
Total mileage 1.03
2022 Road Paving
Total mileage
1. Bogue Dr
.20
2. Andrew Pl
.25
3. Fichter St
.35
4. Elizabeth St Both sections
.15
5. Charles St
.21
Total mileage 1.16
Protected Document Content
Start your free trial to view the raw municipal bid documents and web text.
Unlock Full AccessDetailed Risk Breakdown
local preference
No Flags Found
performance bond
No Flags Found
liquidated damages
No Flags Found
Quick Actions
Explore More
Timeline
First Discovered
May 22, 2026
Last Info Update
May 22, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis. Existing users will be logged in automatically.
Start Free Trial