Start your 7-day free trial — unlock full access instantly.
← Back to Search
Lead Closed
This opportunity is no longer accepting submissions.
Construction Announcements
BID #: N/A
ISSUED: 6/22/2023
DUE: TBD
VALUE: TBD
100
Rating
Risk Rank
Green Risk
AI-Powered Lead Insights
Executive Summary
The Town of Dover is planning several infrastructure improvement projects. These include the Brook Lane Bridge Replacement, which involves replacing an existing one-lane bridge over Jackson Brook. The "2021 Water System Improvements" project focuses on upgrading the water main within specific sections of West Clinton Street and Parker Street. Additionally, the "Small Cities Road" project will address roadway and drainage improvements on Bowlby Street, Grace Street, Sickle Street, and Leonard Street, including milling and paving, and the installation of curbs, sidewalks, and drainage pipes. Survey and design services have been contracted to Pennoni Associates for these projects, with construction for the water system improvements scheduled for July 2023 and small cities road improvements commencing in July 2023 and expected to conclude by September 2023. The Brook Lane Bridge Replacement is anticipated to begin in Spring 2024. Residents will be notified of specific schedules and potential disruptions.
Detailed Risk Breakdown
local preference
No Flags Found
performance bond
No Flags Found
liquidated damages
No Flags Found
Quick Actions
Contacts
Stephen C. Hoyt
Project Manager / Town Engineer · Pennoni Associates / Dover Engineering
hidden@email.com
Unlock(***) ***-****
UnlockWilliam J. Isselin
Chief Code Enforcement Officer / Engineering Department · Dover Engineering Department
hidden@email.com
Unlock(***) ***-****
UnlockRobert Kinsey
Water Superintendent · Dover Water Commission
(***) ***-****
UnlockExplore More
Timeline
First Discovered
May 22, 2026
Last Info Update
Jun 3, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis.
Start Free Trial