Start your 7-day free trial — unlock full access instantly.

Back to Search

Lead Closed

This opportunity is no longer accepting submissions.

Second River Channel Proposed Retaining Wall Replacement

BID #: 263
DUE: 3/15/2023
VALUE: TBD
100
Rating

Risk Rank

Green Risk

AI-Powered Lead Insights

Executive Summary

The City of East Orange, New Jersey, is soliciting bids for the significant "Second River Channel Proposed Retaining Wall Replacement" project, identified by E.O. DPW# 589. This comprehensive public works initiative involves the complete replacement of an existing retaining wall along the Second River Channel. The extensive scope of work includes critical site preparation activities such as clearing the site, erosion control sediment removal, and the installation of both silt fencing and tree protection fencing. Construction phases encompass detailed excavation, robust slope support, and subgrade preparation underneath the new retaining wall. Further elements include structural backfill on both sides of the new retaining wall, precise concrete formwork, expert cast-in-place concrete work, and comprehensive concrete reinforcement. The project concludes with backfill material placement at the retaining walls, borrow topsoil application, fertilizing and seeding using Type A-3, and topsoil stabilization with Type 1 Mat, ensuring structural integrity and environmental restoration. While specific contractor qualifications, mandatory licensing requirements such as NJ Public Works Contractor Registration, and requisite experience levels are not detailed within this particular proposal sheet excerpt, prospective bidders are advised that these crucial criteria would typically be outlined in the full contract specifications available from the City Engineer's office. Standard municipal procurement processes for projects of this nature often mandate contractors possess extensive experience in heavy civil construction, particularly with retaining wall systems, earthwork, and riparian zone work. Furthermore, details regarding any mandatory pre-bid meetings or site visits, which are common for complex infrastructure projects to clarify project conditions and address bidder inquiries, would also be specified in the complete bid package or associated addenda. Submission of proposals for the Second River Channel Proposed Retaining Wall Replacement requires interested firms to complete this detailed proposal sheet, accurately itemizing unit prices for each component of the work, culminating in a total bid price in both numerical and written formats. Although a specific submission deadline, detailed instructions for delivery, or requirements for bid security/bonds (such as bid bonds or consent of surety) are not present in this extracted proposal sheet, these vital submission protocols would be meticulously detailed in the official Invitation to Bid and accompanying contract documents. Bidders are responsible for obtaining the complete bid package, including plans and specifications, which are on file in the office of the City Engineer, to ensure full compliance with all submission requirements. The bid number associated with this project is E.O. DPW# 589.

Detailed Risk Breakdown

local preference

No Flags Found

performance bond

No Flags Found

liquidated damages

No Flags Found

Quick Actions

Explore More

Timeline

First Discovered

Jun 9, 2026

Last Info Update

Jun 9, 2026

Start your 7-day free trial

Get instant notifications and full bid analysis.

Start Free Trial