Start your 7-day free trial — unlock full access instantly.
← Back to Search1 CLAUSES FOUND
Lead Closed
This opportunity is no longer accepting submissions.
Construction Management & Inspection Services For 2018 Srts – Downtown Connection Project Phase – Rfp Documents
BID #: N/A
ISSUED: 3/1/2026
DUE: 4/8/2026
VALUE: TBD
80
Rating
Risk Rank
Red Risk
AI-Powered Lead Insights
Executive Summary
The Borough of High Bridge is seeking proposals from qualified firms to provide construction management and inspection services for the 2018 SRTS – Downtown Connection Project Phase 1. This federally-funded project aims to improve safety for motorists, pedestrians, and bicyclists within the project limits, including new curb, sidewalk, and ADA curb ramp compliance improvements. Responding firms must be NJDOT prequalified in construction inspection. The construction project is expected to be substantially completed within 90 calendar days and final completion within 120 calendar days.
The selected consultant will be responsible for contract administration, inspection, resident engineering, and testing work to ensure the successful completion and acceptance of the project by NJDOT. Key personnel such as the Resident Engineer and Lead Inspector are required to have specific qualifications and experience with federally funded projects. Proposals, including both technical and cost proposals, are due by Wednesday, April 8, 2026, at 11:00 a.m.
This is a qualifications-based selection process in accordance with the Federal Brooks Act. Interested firms may schedule an appointment to review the construction plans, specifications, and construction cost estimate at the High Bridge Borough Hall by calling 908-638-6455. UNLOCK Questions regarding the RFP must be submitted in writing to the Borough Administrator.
Detailed Risk Breakdown
local preference
No Flags Found
performance bond
No Flags Found
liquidated damages
Evidence Detected
"...ime extension. Extension in contract time will only be granted for excusable compensable delays as defined in Section 108.11 of the Specifications. Liquidated damages will be assessed for each day the Contractor fails to complete work within the specified Contract Time. 11 Protests in COs will be resolve..."
Quick Actions
Contacts
Borough Administrator (Project Responsible Charge)
Borough Administrator
hidden@email.com
Unlock(***) ***-****
UnlockExplore More
Timeline
First Discovered
Apr 1, 2026
Last Info Update
Apr 30, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis.
Start Free Trial