Start your 7-day free trial — unlock full access instantly.

Back to Search
High BridgeRed Risk
Open

Construction Management & Inspection Services For 2018 Srts – Downtown Connection Project Phase – Rfp Documents

BID #: N/A
ISSUED: 3/1/2026
DUE: 4/8/2026
VALUE: TBD
80
Rating

Risk Rank

Red Risk

AI-Powered Lead Insights

Executive Summary

The Borough of High Bridge is seeking proposals from qualified firms to provide construction management and inspection services for the 2018 SRTS Downtown Connection Project Phase 1. This federally-funded project aims to improve safety for motorists, pedestrians, and bicyclists within the project limits, including new curb, sidewalk, and ADA curb ramp compliance improvements. Responding firms must be NJDOT prequalified in construction inspection. The construction project is expected to be substantially completed within 90 calendar days and final completion within 120 calendar days. The selected consultant will be responsible for contract administration, inspection, resident engineering, and testing work to ensure the successful completion and acceptance of the project by NJDOT. Key personnel such as the Resident Engineer and Lead Inspector are required to have specific qualifications and experience with federally funded projects. Proposals, including both technical and cost proposals, are due by Wednesday, April 8, 2026, at 11:00 a.m. This is a qualifications-based selection process in accordance with the Federal Brooks Act. Interested firms may schedule an appointment to review the construction plans, specifications, and construction cost estimate at the High Bridge Borough Hall by calling 908-638-6455. UNLOCK Questions regarding the RFP must be submitted in writing to the Borough Administrator.

Detailed Risk Breakdown

local preference

No Flags Found

performance bond

No Flags Found

liquidated damages

Evidence Detected

1 CLAUSES FOUND
"...ime extension. Extension in contract time will only be granted for excusable compensable delays as defined in Section 108.11 of the Specifications. Liquidated damages will be assessed for each day the Contractor fails to complete work within the specified Contract Time. 11 Protests in COs will be resolve..."

Quick Actions

Contacts

Borough Administrator (Project Responsible Charge)

Borough Administrator

hidden@email.com
Unlock
(***) ***-****
Unlock

Explore More

Timeline

First Discovered

Apr 1, 2026

Last Info Update

Apr 8, 2026

Start your 7-day free trial

Get instant notifications and full bid analysis. Existing users will be logged in automatically.

Start Free Trial
Construction Management & Inspection Services For 2018 Srts – Downtown Connection Project Phase – Rfp Documents — High Bridge | MuniBidder