Start your 7-day free trial — unlock full access instantly.
← Back to Search
Lead Closed
This opportunity is no longer accepting submissions.
AI-Powered Lead Insights
Executive Summary
This document presents unofficial bid results for several projects undertaken by the Borough of Hillsdale in 2020. The projects include Shade Tree & Stump Removal, Landscaping on Borough Property, the 2020 Road Program, Computer Systems & Software Applications & Maintenance – General IT Consulting Services, Janitorial Services, Memorial Field Improvements (Rebid), Stonybrook Summer Pool Lease Program, and Memorial Field Improvements. The bids were received throughout the year, with submission deadlines varying for each project. The Stonybrook Summer Pool Lease Program had a minimum bid of $33,000.00.
Web Content
Home Departments > Request for Bids > 2020 Unofficial Bid Results > 2020 BID RESULTS All results are unofficial until awarded (Click on the bid that you want to view) DATE OF BID TITLE 11.24.20 Shade Tree & Stump Removal 11.24.20 Landscaping on Borough Property 7.9.20 WEST LOT RENTAL - NO BIDS RECEIVED 7.9.20 2020 ROAD PROGRAM 5.19.20 Computer Systems & Software Applications & Maintenance – General IT Consulting Services 4.7.20 Janitorial Services - no bids received 4.1.20 Memorial Field Improvements - Rebid 2.19.20 Stonybrook Summer Pool Lease Program 1.10.20 Memorial Field Improvements *All bids have been rejected
Document Text
--- Document: Shade Tree & Stump Removal --- Contractor Address Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Total Bid Item 11 Item 12 Item 13 Item 14 Item 15 Total Bid Full Bid Downes Tree Service 65 Royal Ave Hawthore, NJ 2,250.00 $ 400.00 $ 13,500.00 $ 1,400.00 $ 18,750.00 $ 2,350.00 $ 27,000.00 $ 3,200.00 $ 5,000.00 $ 5,400.00 $ 79,250.00 $ 1,500.00 $ 4,350.00 $ 6,450.00 $ 7,500.00 $ 4,750.00 $ 24,550.00 $ 103,800.00 $ Beucler Tree Experts 48 Harold St Tenafly, NJ 3,250.00 $ 550.00 $ 17,100.00 $ 1,700.00 $ 23,250.00 $ 2,800.00 $ 31,500.00 $ 3,900.00 $ 3,125.00 $ 5,250.00 $ 92,425.00 $ 1,650.00 $ 3,750.00 $ 6,300.00 $ 8,400.00 $ 4,500.00 $ 24,600.00 $ 117,025.00 $ Almstead Tree & Shrub Care504 High Mountan Rd N. Haledon 5,700.00 $ 855.00 $ 15,390.00 $ 1,430.00 $ 20,475.00 $ 2,500.00 $ 37,125.00 $ 4,750.00 $ 3,000.00 $ 5,700.00 $ 96,925.00 $ 2,250.00 $ 3,900.00 $ 6,000.00 $ 8,100.00 $ 3,300.00 $ 23,550.00 $ 120,475.00 $ *addition error in emergecy total Rich Tree Service 325 Bergen St S. Plainfield, NJ 8,250.00 $ 1,500.00 $ 25,650.00 $ 2,600.00 $ 35,250.00 $ 4,400.00 $ 48,375.00 $ 6,000.00 $ 3,500.00 $ 6,000.00 $ 141,525.00 $ 3,000.00 $ 4,650.00 $ 7,350.00 $ 9,750.00 $ 3,250.00 $ 28,000.00 $ 169,525.00 $ $ $ $ $ $ $ $ $ $ $ ‐ $ $ $ $ $ $ ‐ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Shade Tree & Stump Removal 11/24/2020 10:00 EMERGENCY TREE REMOVAL --- Document: Landscaping on Borough Property --- 2021 2021 2022 2022 2023 2023 Contractor Address Item 2 Item 3 Item 2 Item 3 Item 2 Item 3 LTI, Inc 122 Main Rd Montville, NJ $18,000.00 $900.00 $18,000.00 $900.00 $18,000.00 $900.00 2021 2022 Grass Cutting on Borough Owned Property 11/24/2020 11:00 Item 1 $97,250.00 Item 1 $97,250.00 Alternate Bid ‐ Stonybrook Borough Property 2023 Item 1 $97,250.00 Borough Complete Total Bid $291,750.00 --- Document: 2020 ROAD PROGRAM --- BOROUGH OF HILLSDALE 2020 ROAD PROGRM AND NJDOT MUNICIPAL AID BASE AND ALTERNATE BIDS D & L PAVING MIKE FITZPATRICK FRANK A 4 CLEAN-UP INC REIVAX CONTRACTORS, INC. & SON, INC. MACCHIONE CONTRACTING CORP ITEM CONTRACT ITEMS UNIT ESTIMATED UNIT EXT. UNIT EXT. UNIT EXT. UNIT EXT. UNIT EXT. NO. COST QUANTITY PRICE AMT. PRICE AMT. PRICE AMT. PRICE AMT. PRICE AMT. 1 MOBILIZATION L.S. 1 $5,000.00 $5,000.00 $2,500.00 $2,500,00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $4,100.00 $4,100.00 2 BREAKAWAY BARRICADE* UNIT 20 $0.01 $0.20 $1.00 $20.00 $1.00 $20.00 $1.00 $20.00 $1.00 $20.00 3 DRUM* UNIT 30 $0.01 $0.30 $1,00 $30.00 $1.00 $30.00 $1.00 $30.00 $1.00 $30.00 4 CONSTRUCTION SIGNS* S.F. 320 $0.01 $3.20 $1.00 $320.00 $1.00 $320.00 $1.00 $320.00 $1.00 $320.00 5 TRAFFIC DIRECTOR, FLAGGER HOUR 40 $75.53 $3,021.20 $75.53 $3,021.20 $75.53 $3,021.20 $75.53 $3,021,20 $75.53 $3,021.20 6 FUEL PRICE ADJUSTMENT DOLLAR 1 $1,600.00 $1,600.00 $1,600.00 $1,600,00 $1,600.00 $1.600.00 $1,600.00 $1,600.00 $1,600.00 $1,600.00 7 ASPHALT PRICE ADJUSTMENT DOLLAR 1 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 8 CLEARING SITE L.S. 1 $5,000.00 $5,000.00 $2,000.00 $2.000.00 $34,092.30 $34,092.30 $5,000.00 $5,000,00 $5,600.00 $5,600.00 9 HMA MILLING, 2" OR LESS S.Y. 20,425 $3.99 $81,495.75 $3.55 $72,508,75 $4.00 $81,700.00 $4.10 $83,742.50 $4.00 $81.700.00 10 HOT MIX ASPHALT, 9.5M64 SURFACE COURSE, 2" THICK, WITH. NUC ΤΟΝ 5,550 $69.65 $387,667.50 $77.00 $427.350.00 $74.50 $413,475.00 $79.50 $441,225.00 $84.00 $466.200.00 11 HOT MIX ASPHALT, PAVEMENT REPAIR S.Y. 10 $1.00 $10.00 $65.00 $650.00 $15.00 $150.00 $15.00 $150.00 $1.00 $10.00 12 CURB PIECE, NJDEP ECO TYPE "N" UNIT 28 $280.00 $7,840.00 $385.00 $10,780.00 $1.00 $28.00 $250.00 $7,000.00 $1.00 $28.00 13 BICYCLE SAFE GRATE UNIT 27 $280.00 $7.560.00 $385.00 $10,395.00 $1.00 $27.00 $300.00 $8,100.00 $1.00 $27.00 14 RESET EXISTING CASTING UNIT 47 $1.00 $47.00 $325.00 $15,275.00 $200.00 $9,400.00 $150.00 $7,050.00 $1.00 $47.00 15 RECONSTRUCTED INLET, TYPE B, USING EXISTING FRAME, 0' TO 5' UNIT 5 $550.00 $2,750.00 $975.00 $4,875.00 $750.00 $3,750.00 $150.00 $750,00 $1,000.00 $5,000.00 16 RECONSTRUCTED INLET, TYPE B, USING EXISTING FRAME, 5' TO 10 UNIT 2 $350.00 $700.00 $1,300.00 $2,600.00 $750.00 $1,500.00 $150.00 $300.00 $1,300.00 $2,600.00 17 9" X 20" CONCRETE VERTICAL CURB L.F. 40 $50.00 $2,000.00 $45.00 $1,800.00 $55.00 $2,200.00 $50.00 $2,000.00 $40.00 $1,600.00 18 TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC 4" WIDE L.F. 1,275 $1.50 $1,912.50 $1.00 $1,275.00 $1.10 $1.402.50 $1.10 $1,402.50 $2.00 $2,550.00 19 TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC 8" WIDE L.F. 75 $3.00 $225.00 $5.00 $375.00 $2.20 $165.00 $2.20 $165.00 $3.00 $225.00 20 TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC 24" WIDE L.F. 190 $8.00 $1,520.00 $7.00 $1,330.00 $6.60 $1,254.00 $6.60 $1,254,00 $7.00 $1,330.00 21 TREE REMOVAL, 12" TO 20" DIA. UNIT 1 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $995.00 $995.00 $1,200.00 $1,200.00 22 TOPSOIL SPREADING, 4" THICK S.Y. 10 $50.00 $500.00 $6.00 $60.00 $3.00 $30.00 $1.00 $10.00 $1.00 $10.00 23 FERTILIZING AND SEEDING, TYPE A-3* S.Y. 10 $0.01 $0.10 $1.00 $10.00 $2.00 $20.00 $1.00 $10.00 $1.00 $10.00 24 STRAW MULCHING* S.Y. 10 $0.01 $0.10 $1.00 $10.00 $1.00 $10.00 $1.00 $10.00 $1.00 $10.00 BASE TOTAL $514,152.85 $564,084.95 $564,495.00 $581,538.20 $573,455.20 BID SPREAD-ALTERNATE BID 25A EXCAVATION, UNCLASSIFIED C.Y. 40 $38.00 $1,520.00 $55.00 $2,200.00 $75.00 $3,000.00 $50.00 $2,000.00 $1.00 $40.00 26A 27A DENSE GRADED AGGREGATE, BASE COURSE, 6" THICK HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE, 2" THICK S.Y. 165 $9.00 $1,485.00 $8.00 $1,320.00 $75.00 $12.375.00 $30.00 $4,950,00 $1.00 $165.00 TONS 35 $202.00 $7,070,00 $79.00 $2,765.00 $300.00 $10,500.00 $275.00 $9,625.00 $220.00 $7,700.00 28A 12" HIGH DENSITY POLYETHYLENE PIPE L.F. 180 $110.00 $19,800.00 $65.00 $11,700.00 $135.00 $24,300.00 $85.00 $15,300.00 $80,00 $14,400.00 29A INLET TYPE A UNIT 4 $2,800.00 $11,200.00 $1,600.00 $6,400.00 $2,500.00 $10,000.00 $3,000.00 $12,000.00 $3,400.00 $13.600.00 30A MANHOLE, 4' DIAMETER UNIT 1 $4,000.00 $4,000.00 $2,600.00 $2.600.00 $2,250.00 $2,250.00 $3,200.00 $3,200.00 $4,500.00 $4,500.00 31A REGULATORY AND WARNING SIGN S.F. 8 $50.00 $400.00 $50.00 $400.00 $40.00 $320.00 $40.00 $320.00 $44,00 $352.00 32A TREE REMOVAL, OVER 6" TO 12" DIAMETER UNIT 15 $500.00 $7.500.00 $1,000.00 $15,000.00 $500.00 $7,500.00 $495.00 $7,425.00 $700.00 $10,500.00 33A TREE REMOVAL, OVER 18" TO 24" DIAMETER UNIT 3 $1,300.00 $3,900.00 $2,000.00 $6,000.00 $750.00 $2,250.00 $995.00 $2.985.00 $1,400.00 $4,200.00 34A 6" POLYVINYL CHLORIDE SEWER PIPE, SDR-35 L.F. 45 $100.00 $4,500.00 $150.00 $6,750.00 $150.00 $6,750.00 $200.00 $9,000.00 $80.00 $3,600.00 ALTERNATE TOTAL $61,375.00 TOTAL $55,135.00 TOTAL $79,245.00 TOTAL $66,805.00 TOTAL $59,057.00 BASE +ALTERNATE TOTAL $575,527.85 $619,219.95 $643,740.00 $640,260.20 $640,595.20 1 BOROUGH OF HILLSDALE 2020 ROAD PROGRM AND NJDOT MUNICIPAL AID BASE AND ALTERNATE BIDS CCM CONTRACTING, INC JA ALEXANDER DLS CONTRACTING, INC. CROSSROADS PAVEMENT ΜΑΙΝΤΕΝΑNCE LLC BLACK ROCK ENTERPRISES, LLC ITEM CONTRACT ITEMS UNIT ESTIMATED NO. COST QUANTITY UNIT PRICE EXT. AMT. UNIT PRICE EXT. UNIT EXT. UNIT EXT. UNIT EXT. AMT. PRICE AMT. PRICE AMT. PRICE AMT. 1 MOBILIZATION L.S. 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $1.00 $1.00 $20,000.00 $20,000.00 $10,000.00 $10,000.00 2 BREAKAWAY BARRICADE* UNIT 20 $0.01 $0.20 $0.01 $0.20 $1.00 $20.00 $100.00 $2,000.00 $1.00 $20.00 3 DRUM* UNIT 30 $0.01 $0.30 $0.01 $0.30 $1.00 $30.00 $1.00 $30.00 $1.00 4 CONSTRUCTION SIGNS* $30.00 S.F. 320 $0.01 $3.20 $0.01 $3.20 $1.00 $320.00 $10.00 $3,200.00 5 TRAFFIC DIRECTOR, FLAGGER $1.00 $320.00 HOUR 40 $75.53 $3,021.20 $75.53 $3,021.20 $75,53 $3,021.20 $75.53 $3,021.20 $75.53 6 FUEL PRICE ADJUSTMENT $3,021.20 DOLLAR 1 $1,600.00 $1,600.00 $1,600.00 $1,600.00 $1,600.00 $1,600.00 $1,600.00 $1,600.00 $1,600.00 7 ASPHALT PRICE ADJUSTMENT $1,600.00 DOLLAR 1 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 $4.300.00 $4,300.00 $4,300.00 8 CLEARING SITE $4,300.00 L.S. 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,429.00 $10,429.00 $12,000.00 9 HMA MILLING, 2" OR LESS $12,000.00 $10,000.00 $10,000.00 S.Y. 20,425 $3.75 $76,593.75 $5.50 $112,337.50 $4.50 $91,912.50 $4.50 $91,912.50 $4.50 10 HOT MIX ASPHALT, 9.5M64 SURFACE COURSE, 2" THICK, WITH. NUC $91,912.50 ΤΟΝ 5,550 $79.00 $438,450.00 $81.64 $453,102.00 $85.00 $471,750.00 $79.70 $442,335.00 $85.00 11 HOT MIX ASPHALT, PAVEMENT REPAIR $471,750.00 S.Y. 10 $60.00 $600.00 $0.01 $0.10 $35.00 $350.00 $95.00 $950.00 $60.00 $600.00 12 CURB PIECE, NJDEP ECO TYPE "N" UNIT 28 $350.00 $9,800.00 $275.00 $7,700.00 $300.00 $8,400,00 $350.00 $9,800.00 $350.00 13 BICYCLE SAFE GRATE $9,800.00 UNIT 27 $350.00 $9,450,00 $275.00 $7,425.00 $300.00 $8,100.00 $300.00 $8,100.00 $350.00 14 RESET EXISTING CASTING $9,450.00 UNIT 47 $300.00 $14,100.00 $0.01 $0.47 $1.00 $47.00 $200.00 $9,400.00 $350.00 15 RECONSTRUCTED INLET, TYPE B, USING EXISTING FRAME, 0' TO 5' $16,450,00 UNIT 5 $1,100.00 $5,500.00 $500.00 $2,500.00 $1,900.00 $9,500.00 $950.00 $4,750.00 $2,200.00 16 RECONSTRUCTED INLET, TYPE B, USING EXISTING FRAME, 5' TO 10 $11,000.00 UNIT 2 $1,250.00 $2,500.00 $550.00 $1,100.00 $1,900.00 $3,800.00 $1,800.00 $3.600.00 $3,000.00 17 9" X 20" CONCRETE VERTICAL CURB $6,000.00 L.F. 40 $35.00 $1,400.00 $50.00 $2,000.00 $40.00 $1,600.00 $95.00 $3,800.00 $80.00 18 TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC 4" WIDE $3,200.00 L.F. 1,275 $1.00 $1,275.00 $1.10 $1,402.50 $1.15 $1,466.25 $2.20 $2,805.00 $1.50 $1,912.50 19 TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC 8" WIDE L.F. 75 $3.00 $225.00 $2.20 $165.00 $2.25 $168.75 $3.50 $262.50 $3.00 20 TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC 24" WIDE $225.00 L.F. 190 $12.00 $2,280.00 $6.60 $1,254.00 $7.00 $1,330.00 $7.00 $1.330.00 $8.00 $1,520.00 21 TREE REMOVAL, 12" TO 20" DIA. UNIT 1 $2,500.00 $2,500.00 $1,250.00 $1,250.00 $1,500.00 $1,500.00 $1,800.00 $1,800.00 $3,000.00 $3,000.00 22 TOPSOIL SPREADING, 4" THICK S.Y. 10 $5.00 $50.00 $5.00 $50.00 $3.00 $30.00 $20.00 $200.00 $25.00 $250.00 23 FERTILIZING AND SEEDING, TYPE A-3* S.Y. 10 $5.00 $50.00 $0.55 $5.50 $1.00 $10.00 $5.00 $50.00 $10.00 $100.00 24 STRAW MULCHING* S.Y. 10 $5.00 $50.00 $0.55 $5.50 $1.00 $10,00 $5.00 $50.00 $10.00 $100.00 BASE 1 $593,748.65 $619,222.47 $619,695.70 $627,296.20 $656,561.20 25A EXCAVATION, UNCLASSIFIED C.Y. 40 $30.00 $1,200.00 $0.01 $0.40 $40.00 $1,600.00 $100.00 $4,000.00 $50.00 $2,000.00 26A 27A DENSE GRADED AGGREGATE, BASE COURSE, 6" THICK HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE, 2" THICK S.Y. 165 $8.50 $1,402.50 $140.00 $23.100.00 $8.00 $1,320.00 $35.00 $5,775.00 $10.00 $1.650.00 TONS 35 $90.00 $3,150.00 $85.00 $2,975.00 $85.00 $2,975.00 $150.00 $5,250.00 $280.00 $9,800.00 28A 12" HIGH DENSITY POLYETHYLENE PIPE L.F. 180 $60.00 $10,800.00 $100.00 $18,000.00 $70.00 $12,600,00 $90.00 $16.200.00 $90.00 $16,200.00 29A INLET TYPE A UNIT 4 $1,250.00 $5,000.00 $3,500.00 $14,000.00 $2,900.00 $11,600.00 $3,500.00 $14,000.00 $3,600.00 $14,400.00 30A MANHOLE, 4' DIAMETER UNIT 1 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $4,500.00 $4,500.00 $5,000.00 $5,000.00 31A REGULATORY AND WARNING SIGN S.F. 8 $85.00 $680.00 $44.00 $352.00 $40.00 $320.00 $75.00 $600.00 $100.00 32A TREE REMOVAL, OVER 6" TO 12" DIAMETER $800,00 UNIT 15 $1,500.00 $22,500.00 33A TREE REMOVAL, OVER 18" TO 24" DIAMETER UNIT 3 $2,600.00 34A 6" POLYVINYL CHLORIDE SEWER PIPE, SDR-35 L.F. 45 $40.00 $7,800.00 $1.800.00 $325.00 $850.00 $185.00 $4,875.00 $2.550.00 $8,325.00 $400.00 $6,000.00 $400.00 $6,000.00 $1,000.00 $15,000.00 $1,000.00 $3,000.00 $2,000.00 $6,000.00 $2,500.00 $7,500.00 $150.00 $6,750.00 $90.00 $4,050.00 $200.00 $9,000.00 ALTERNA TOTAL $56,832.50 TOTAL $79,177.40 TOTAL $50,165.00 TOTAL $66,375.00 TOTAL $81,350.00 BASE +ALTERNATE $650,581.15 $698,399.87 $669,860.70 $693,671.20 $737,911.20 2 BOROUGH OF HILLSDALE 2020 ROAD PROGRM AND NJDOT MUNICIPAL AID BASE AND ALTERNATE BIDS ITEM CONTRACT ITEMS UNIT ESTIMATED NO. COST QUANTITY UNIT PRICE DIAMOND CONSTRUCTION EXT. AMT. 1 MOBILIZATION L.S. 1 $75,000.00 $75,000,00 2 BREAKAWAY BARRICADE* UNIT 20 $0.01 $0.20 3 DRUM UNIT 30 $0.01 $0.30 4 CONSTRUCTION SIGNS* S.F. 320 $0.01 $3.20 5 TRAFFIC DIRECTOR, FLAGGER HOUR 40 $75.53 $3,021.20 6 FUEL PRICE ADJUSTMENT DOLLAR 1 $1,600.00 $1,600.00 --- Document: Memorial Field Improvements - Rebid --- NAME ADDRESS Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Item 9 Mobilization Soil Erosion/Sediment Control Clearing Site Site Excavation & Furnish & Install Topsoiling 6" Footpath Warning TracConcrete Pad for Total w/o Embankment Clay Infield Thick & Sod 4" Thick 4" Thick Bleacher Alternates Richard Wogisch Landscape Contractor 169 Lakeview Ave Ringwood, NJ $5,000 $3,500.00 $8,000.00 $36,000.00 $4,680.00 $9,900.00 $4,830.00 $12,100.00 $7,000.00 $67,080.00 Balitano Construction 298 Forest Rd Fort Lee, NJ $25,000.00 $4,000.00 $25,000.00 $10,400.00 $25,200.00 $15,300.00 $6,670.00 $9,350.00 $8,820.00 $104,900.00 Matinia & Son 146 English St Hackensack, NJ $3,299.00 $1.00 $50,000.00 $50,000.00 $15.00 $6.00 $11,500.00 $27,500.00 $8,750.00 $119,500.00 MEMORIAL FIELD 4/1/20200 11:00:00 AM ALTERNATES --- Document: Stonybrook Summer Pool Lease Program --- 2/19/2020 11:00 COMPANY NAME/ PHONE/ Use of Swim ADDRESS FAX NUMBER Club Lap Pool & Main Pools April 15-August 31 2020 Min Bid $33,000.00 Phoenix Aquatic Club USA LLC 845-708-5349 139 Goebel Road $33,000.00 New City, NY 10956 Stonybrook Swim Club Summer Pool Lease Program Unofficial Bid Results --- Document: Memorial Field Improvements --- NAME ADDRESS Item 1 Item 2 Item 3 Item 4 Item 5 Item 6 Item 7 Item 8 Item 9 Item 10 Mobilization Soil Erosion/Sediment Control Clearing Site Site Excavation & Furnish & Install Modify Exisiting Topsoiling 6" Footpath Warning Track Concrete Pad for Embankment Clay Infield Irrigation System Thick & Sod 4" Thick 4" Thick Bleacher TOTAL PRICE Matina & Son 146 English St Hackensack, NJ $3,299 $1.00 $50,000 $50,000 $10,800 $10,500 $5,400 $11,500 $27,500 $8,750 $130,000.00 Bob Viersma & Sons PO Box 224 Allamuchy, NJ 07820 $6,500 $5,000 $7,500 $37,750 $33,120 $24,000 $27,000 $21,850 $33,550 $18,550 $140,870.00 MEMORIAL FIELD 1/10/2020 11:00
Protected Document Content
Start your free trial to view the raw municipal bid documents and web text.
Unlock Full AccessDetailed Risk Breakdown
local preference
No Flags Found
performance bond
No Flags Found
liquidated damages
No Flags Found
Quick Actions
Explore More
Timeline
First Discovered
Apr 2, 2026
Last Info Update
Apr 2, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis. Existing users will be logged in automatically.
Start Free Trial