Start your 7-day free trial — unlock full access instantly.

Back to Search

Lead Closed

This opportunity is no longer accepting submissions.

Water Meters and Parts, Cold

BID #: N/A
ISSUED: 6/1/2022
DUE: 6/16/2022
VALUE: TBD
100
Rating

Risk Rank

Green Risk

AI-Powered Lead Insights

Executive Summary

This procurement opportunity seeks qualified vendors to supply a comprehensive range of water meters and associated parts, specifically those designed for cold water applications. The project encompasses the acquisition of various meter types, potentially including positive displacement, turbine, compound, or ultrasonic meters, suitable for residential, commercial, and industrial installations. The scope also includes all necessary components for installation, maintenance, and repair, such as meter couplings, gaskets, registers, transmitters, and automated meter reading (AMR) or advanced metering infrastructure (AMI) endpoints. The issuing entity, while not explicitly named in this excerpt, is anticipated to be a municipal water utility or public works department responsible for maintaining and upgrading its water distribution network. The objective is to ensure accurate water measurement, reduce non-revenue water loss, and support efficient billing operations through the provision of reliable, high-quality metering equipment. This initiative is crucial for the continuous improvement of the water utility's operational efficiency and customer service capabilities. Contractor qualifications, specific licensing requirements, and prerequisite experience levels are not detailed within this provided document excerpt. However, it is standard for bids involving specialized equipment like water meters to require vendors to demonstrate substantial experience in supplying similar products to municipal or utility clients. Prospective bidders would typically need to prove a robust supply chain, technical expertise in water metering technologies, and a track record of successful deliveries. Any mandatory pre-bid meetings, site visits, or specific vendor certifications (e.g., ISO compliance, manufacturer authorizations) are also not outlined in this initial project description but would be critical considerations for any interested parties. Vendors would generally be expected to possess all applicable federal, state, and local business licenses, and potentially specialized certifications relevant to water utility infrastructure. Detailed submission instructions, including the precise bid submission deadline, required bid security (such as bid bonds or certified checks), and performance bonding requirements, are not present in this brief project announcement. Prospective bidders should anticipate that full solicitation documents will provide comprehensive guidelines on proposal formatting, required documentation (e.g., technical specifications, pricing schedules, warranty information), and the specific electronic or physical submission methods. Contact information for inquiries, including the purchasing agent or project manager, is also not furnished in this excerpt. Bidders are advised to carefully review the complete Request for Proposal (RFP) or Invitation for Bid (IFB) document once released to understand all procedural requirements, evaluation criteria, and the official channels for communication regarding this water meter procurement.

Detailed Risk Breakdown

local preference

No Flags Found

performance bond

No Flags Found

liquidated damages

No Flags Found

Quick Actions

Explore More

Timeline

First Discovered

Jun 10, 2026

Last Info Update

Jun 10, 2026

Start your 7-day free trial

Get instant notifications and full bid analysis.

Start Free Trial