Start your 7-day free trial — unlock full access instantly.
← Back to Search
Ocean (Monmouth)Green RiskOpenBuilding & Construction
Framing Checklist
BID #: N/A
DUE: TBD
VALUE: TBD
100
Rating
Risk Rank
Green Risk
AI-Powered Lead Insights
Executive Summary
This document is a framing checklist used by builders, their representatives, and building inspectors to ensure that framing work conforms to released plans and the requirements of the Uniform Construction Code, N.J.A.C. 5:23. The checklist covers various aspects of framing, including basement and crawl spaces, floor framing and flooring, walls, and roof framing. It outlines specific items to be inspected, such as the size, grade, species, attachment, and spacing of various framing components.
Web Content
Automated discovery link found on Ocean (Monmouth) website.
Document Text
--- Document: Framing Checklist Document ---
F R A M I N G C H E C K L I S T
Note: All items should be as shown on the plans or as required by code.
Instructions: Builder or Builder’s representative checks boxes marked ‘B’. Building Inspector checks boxes marked ‘I’. Responsible Person in Charge of Work signs, initials and dates
in spaces provided. Building Inspector initials and dates in spaces provided.
A.
. .
.
. Basement or Cr
Basement or Cr
Basement or Cr
Basement or Cr
Basement or Crawl Space
l Space
l Space
l Space
l Space
U.C.C. F390-1 (01/06)
B.
B.
B.
B.
B. Floor F
Floor F
Floor F
Floor F
Floor Framing and Floor
aming and Floor
aming and Floor
aming and Floor
aming and Flooring
ing
ing
ing
ing
3. Floor Jois
3. Floor Jois
3. Floor Jois
3. Floor Jois
3. Floor Joist:
1st 2nd 3rd Floor
Sized per Plan
Grade, Species
Pre-Engineered Components
as Specified
Bearing
Nailing
Bridging
Cutting and Notching (as per code)
Point Loads -- Supported as per Plan
Span Hangers
Headers
Framed Openings
4. Floor
4. Floor
4. Floor
4. Floor
4. Flooring, Sheat
ing, Sheat
ing, Sheat
ing, Sheat
ing, Sheathing, or Dec
hing, or Dec
hing, or Dec
hing, or Dec
hing, or Decking:
king:
king:
king:
king:
1st
2nd
3rd Floor
Material
Panel span, Thickness
Special Requirements
Edge Blocking (if required)
Gapping
Layout
5. S
5. S
5. S
5. S
5. Stair A
air A
air A
air A
air Att
tt
tt
tt
ttac
ac
ac
ac
achment
hment
hment
hment
hment:
1st 2nd 3rd Floor
Bearing
Nailing
1. Bo
. Bo
. Bo
. Bo
. Box or Rim Jois
x or Rim Jois
x or Rim Jois
x or Rim Jois
x or Rim Joist, or P
t, or P
t, or P
t, or P
t, or Per
er
er
er
erime
ime
ime
ime
imeter Band Jois
er Band Jois
er Band Jois
er Band Jois
er Band Joist:
1st
2nd 3rd Floor
Size
Grade, Species
Single or Double
Pre-Engineered per Manu-
Facturer’s Specs
Cantilevers as per Design
2. Gir
2. Gir
2. Gir
2. Gir
2. Girder
der
der
der
ders and Beams:
s and Beams:
s and Beams:
s and Beams:
s and Beams:
Sized per Plan
Type
Grade, Species
Location and Relation
to the Plan
Nailing
Attachment Schedule
Bearing
Lapping
1. Anc
. Anc
. Anc
. Anc
. Anchor
hor
hor
hor
horag
ag
ag
ag
age:
e:
e:
e:
e:
Bolts
Spacing
Size
Straps
Spacing (per manufacturer’s specs)
Size
2. Sill Plat
2. Sill Plat
2. Sill Plat
2. Sill Plat
2. Sill Plates:
es:
es:
es:
es:
Size
Grade, Species
Treatment
Laps
Sill Sealer
Proper Treatment over Foundation Openings (bearing of joist)
Termite Protection
4. Columns:
4. Columns:
4. Columns:
4. Columns:
4. Columns:
Sized per Plan
Attachment/Plates
Spacing/Location
Paint/Coating
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
I hereby certify that I inspected this building using this checklist and it conforms to the released plans
and to the requirements of the Uniform Construction Code, N.J.A.C. 5:23.
Responsible Person in Charge of Work: Date:
Building Inspector
Initials:
Date:
3. Beam P
3. Beam P
3. Beam P
3. Beam P
3. Beam Poc
oc
oc
oc
ockets:
ts:
ts:
ts:
ts:
Bearing/Shims
Termite Protection or Clearance
B I
B I
B I
B I
B I
B I
B I
B I
B I
LOT: __________ BLOCK: __________
PERMIT # __________
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
Initials: Resp. Person in Charge of Work Building Inspector
U.C.C. F390-2 (01/06)
D.
D.
D.
D.
D. Roof F
oof F
oof F
oof F
oof Framing
aming
aming
aming
aming
1. T
. T
. T
. T
. Truss R
uss R
uss R
uss R
uss Roof F
oof F
oof F
oof F
oof Framing (as per design):
aming (as per design):
aming (as per design):
aming (as per design):
aming (as per design):
Approved Documents which Show:
Layout Plans
Truss Members
Connection Schedule
Permanent Bracing Details
Dormers/Roof Structures on
Manufacturer’s Drawings
Equipment/Appliances on Man-
ufacturer’s Drawings
Location as per Layout
Alignment
Bearing
Spacing
Connections to Bearing Points
No Connection to Non-Bearing Points
Damage and Defects
Engineered Method of Repair
2. P
2. P
2. P
2. P
2. Per
er
er
er
ermanent T
manent T
manent T
manent T
manent Truss-t
uss-t
uss-t
uss-t
uss-to-
o-
o-
o-
o-Truss Br
uss Br
uss Br
uss Br
uss Bracing
acing
acing
acing
acing
(as per design):
(as per design):
(as per design):
(as per design):
(as per design):
Layout
Size
Type
Nailing
Overlap
Termination
Transition (i.e., Cross) Bracing
3. Gable End Br
3. Gable End Br
3. Gable End Br
3. Gable End Br
3. Gable End Bracing (as per design):
acing (as per design):
acing (as per design):
acing (as per design):
acing (as per design):
Layout
Size
Type
Nailing
Overlap
Termination
4. Solid Sa
4. Solid Sa
4. Solid Sa
4. Solid Sa
4. Solid Sawn R
wn R
wn R
wn R
wn Roof F
oof F
oof F
oof F
oof Framing:
aming:
aming:
aming:
aming:
Size
Grades, Species
Layout
Spacing
Span
Bearing
Fastening
Damage Caused by Fasteners
(rafters not split by toenails)
Cutting, Notching, and Boring
Bridging
Ridge Size
Hurricane Ties Where Applicable
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
E.
E.
E.
E.
E. Sheat
Sheat
Sheat
Sheat
Sheathing
hing
hing
hing
hing
1. Sheat
. Sheat
. Sheat
. Sheat
. Sheathing -- Ext
hing -- Ext
hing -- Ext
hing -- Ext
hing -- Exter
er
er
er
erior W
ior W
ior W
ior W
ior Walls:
alls:
alls:
alls:
alls:
Material
Panel Span, Thickness
Special Requirements
Gapping
Layout
Corner Bracing (if required)
2. Sheat
2. Sheat
2. Sheat
2. Sheat
2. Sheathing -- R
hing -- R
hing -- R
hing -- R
hing -- Roof:
oof:
oof:
oof:
oof:
Material
Panel span, Thickness
Special Requirements
Blocking, Edge (if required) Gapping
Clips (if required) Layout
B I
B I
Sheathing, FRT -- Roof
Four Feet from Firewall
Noncorrosive Fasteners
B I
B I
B I
B I
PERMIT # __________
LOT: __________ BLOCK: __________
B I
B I
B I
B I
B I
B I
B I
1
1
1
1
1. Ext
. Ext
. Ext
. Ext
. Exter
er
er
er
erior W
ior W
ior W
ior W
ior Wall F
all F
all F
all F
all Frame:
ame:
ame:
ame:
ame:
1st
2nd
3rd Floor
Size
Space
Species and Grade
Cutting, Notching,
and Boring
Header Sizes
Jack Stud Bearing
Top Plates
Nailing
Laps
Rafter Ties
Hurricane Straps
(as required)
C.
C.
C.
C.
C. Wall F
all F
all F
all F
all Framing
aming
aming
aming
aming
3. Int
3. Int
3. Int
3. Int
3. Inter
er
er
er
erior N
ior N
ior N
ior N
ior Non-Load-Bear
on-Load-Bear
on-Load-Bear
on-Load-Bear
on-Load-Bearing W
ing W
ing W
ing W
ing Walls:
alls:
alls:
alls:
alls:
1st 2nd
3rd Floor
Size
Space
Species and Grade
Cutting, Notching,
and Boring
Fire Blocking
Header Sizes
Top Plate Nailing
2. Int
2. Int
2. Int
2. Int
2. Inter
er
er
er
erior Load-Bear
ior Load-Bear
ior Load-Bear
ior Load-Bear
ior Load-Bearing W
ing W
ing W
ing W
ing Walls:
alls:
alls:
alls:
alls:
1st 2nd
3rd Floor
Size
Space
Layout - Support Below
per Code
Species and Grade
Cutting, Notching, and
Boring
Fire Blocking
Header Sizes
Jack Stud Bearing
Top Plates
Nailing
Laps
Strapping
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
B I
Protected Document Content
Start your free trial to view the raw municipal bid documents and web text.
Unlock Full AccessDetailed Risk Breakdown
local preference
No Flags Found
performance bond
No Flags Found
liquidated damages
No Flags Found
Quick Actions
Explore More
Timeline
First Discovered
Apr 2, 2026
Last Info Update
Apr 5, 2026
Start your 7-day free trial
Get instant notifications and full bid analysis. Existing users will be logged in automatically.
Start Free Trial