Lead Closed

This opportunity is no longer accepting submissions.

RidgewoodRed Risk
Closed
General

Rebid Soil Removal at Zabriskie-Schedler Property

BID #: 56
ISSUED: 1/14/2026
DUE: 1/30/2026
VALUE: TBD
70
Rating

Risk Rank

Red Risk

AI-Powered Lead Insights

Executive Summary

This is a rebid for the removal of impacted soils at the Schedler-Zabriskie Property in the Village of Ridgewood. The project includes removing approximately 14,000 tons of soil berm, transporting and disposing of contaminated material (14,000 tons), excavating and disposing of non-berm contaminated material (11,100 tons), excavating and disposing of visually observed solid waste (12,000 tons), removing trees and other vegetation, and backfilling/site restoration with supplied material (38,000 tons). Bid documents can be obtained from the Division of Engineering for a non-refundable fee of $30.00. Sealed bids must be submitted to the Village Hall Level Four Courtroom, 131 North Maple Avenue, Ridgewood, New Jersey 07450, by February 3, 2026, at 10:00 a.m. Each bid must include a certified check, cashier's check, or Bid Bond for ten percent (10%) of the amount bid, or $20,000, whichever is less, along with other required documents. Bidders must comply with the Prevailing Wage Act, the Public Works Contractor Registration Act, and provide copies of their New Jersey Business Registration Certificate and Certificate of Employee Information Report.

Detailed Risk Breakdown

local preference

No Flags Found

performance bond

Evidence Detected

1 CLAUSES FOUND
"...The successful bidder shall furnish and deliver to the Village of Ridgewood a performance and payment bond in the amount of 100 percent of the accepted bid amount as security for the faithful performance of the Contract...."

liquidated damages

Evidence Detected

1 CLAUSES FOUND
"...In default thereof, said checks and/or bid bond and the amount represented thereby shall be forfeited to the Village of Ridgewood as liquidated damages, not as a penalty...."

Quick Actions

Explore More

Timeline

First Discovered

Mar 30, 2026

Last Info Update

Apr 28, 2026